Report Scope and Boundary
The scope of the report extends to all operations of Hindustan Zinc Limited. These include five mining locations, three smelters, and one refinery. The boundary for the identified material aspects is primarily limited to the operations of the Company. It extends to encompass the entire value chain for certain material aspects based upon its relevance to the sustainability strategy of Hindustan Zinc and the relevance to stakeholder interests.
Report Content
This is HZL's third Sustainability Report and discloses information from 1st April 2017 - 31st March 2018. This year's report has been prepared as per GRI Standard “in accordance”- Core criteria, including the technical protocols of the Mining and Metals Sector Supplement.
The data has been reviewed for completeness and accuracy at the operations level. Unless otherwise stated, we have reported the data using the metric system and the currency has been reported as Indian rupees. The GRI Index at the end of this report provides a list of GRI Indicators and Disclosures (as per GRI Standard) and their locations within this report.
Assurance of this report was carried out in accordance with the International Standard on Assurance Engagements 3000 (revised) by M/s KPMG.
Growth Boundaries
Mines
Rampura Agucha Mine | Kayad Mine
Zawar Mining Complex
Sindesar Khurd Mine | Rajpura Dariba Mine
Smelters & Refineries
Chanderiya Smelting Complex
Dariba Smelting Complex
Debari Zinc Smelter | Pantnagar Metal Plant
Accessibility | Privacy Policy | Contact Us | Feedback | © HZL 2018 Cognito
Top